Wells MOD-400TD User Manual Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
3
=
=
21
7.
Adjust the line guide vertically so that it is
midway between the line drum flanges. If the
casing or line guard come into contact with the
line drum flanges, unnecessary friction will be
caused.
6. Tighten the screw lightly.
8.
Adjust the alignment of the line guide towards
the lead block and tighten the screw. (See also
chapter 6.3, "Furling line arrangement".)
Fig. 4.3.f
Fig. 4.3.g
Fig. 4.3.h
At this stage the furling line arrangement should be tted. See "Routing of the furling line",
chapter 6.3 for instructions. After the line is tted, the line guard should be carefully re-aligned and the
locking screw permanently tightened.
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 55 56

Comments to this Manuals

No comments